Killing the Planet
My BA2.2 Thesis project, The Death of the High Street, Leeds City Centre, LS1 1UR
City Mapping and Typology Understanding
Selection of High Streets | The Study Location
Early Analysis of Leeds | Focused on my site
Generating "ideas" | What is the future for Leeds?
Research Model | Use of the High Street
What is VS What could be
Psychological Study of the Impact of Leeds' Infrastructure
The Harsh Reality
The Bad and the Ugly | Site Analysis Visual
Project Manifesto | The Supernatural
Developing a Story
Linking A and B | Resolving the Story
Sketch Plans and Sections | Scope of Proposal
How does the public respond?
Confirming the Speculative Project | Leeds 2075
Week 1 | A lingering smoke
Week 4 | Where is it going?
Week 7 | Anchoring down as a Hostile Impossible Structure
Initiating Research and Intervention across demographics
A closer look | Collage Graphic of Leeds 2075
Full Scheme Section | Hand Drawn and Photoshopped
The Reflected Ceiling Plan | What is seen when we look up?
Inhabiting Space in the Mirrored Reality
Storyline Graphic | Addressing the Chaotic Impact of Urban Neglect